Service manual

2-18 AlphaServer GS80/160/320 Service Manual
2.5 Power Applied Vaux Present
When power is applied, the microprocessors on the CSB execute their
built-in self-test (BIST) and the system control manager takes control
of the system. Micros on the CSB are SCMs, PSMs, HPM, and PBMs.
Example 2 1 System Control Manager Power-Up Display
Master SCM |
Testing SCM EEPROM – Passed |
Initializing Evs |
SCM Selftest Passed |
Polling CSB............................
OCP will be inactive for first 12 seconds after micro reset
SCM_E0>
Querying the modem port...no device detected
SCM_E0> |
~I~ CSB Node 10 connection added |
SCM_E0> |
~I~ CSB Node 11 connection added |
SCM_E0> PS1 in PBP0 added |
PS2 in PBP0 added |
Remote IOR0 added to PBP0 |
SCM_E0> |
~I~ CSB Node 40 connection added |
SCM_E0> PS1 in PBP1 added |
PS2 in PBP1 added |
Remote IOR0 added to PBP1 |
SCM_E0> PS2 in HS0 added |
GP0 Cable Present |
GP1 Cable Present |
GP2 Cable Present |
GP3 Cable Present |
SCM_E0> |
~I~ CSB Node 30 connection added |
SCM_E0> |
~I~ CSB Node 31 connection added |
SCM_E0> |
~I~ CSB Node 32 connection added |
SCM_E0> |
~I~ CSB Node 33 connection added |