Service manual
1-102 AlphaServer GS80/160/320 Service Manual
1.22.4 Power Distribution Panel and Power Cabinet Bulkhead
The power distribution panel is located on the rear of the power
subrack. The power cabinet bulkhead is located between the power
cabinet and system cabinet 1. There are two power cabinet bulkheads,
one for cables running from the subracks to system cabinet 1 and
another for cables running from the subracks to system boxes in
system cabinet 2.
Figure 1– 47 Power Cabinet Cabling and Distribution Panel
1
1
2
3
3
4
5
PK1533