Installation guide
Adding a System to a Multiple-System Configuration with One SMC 6-9
Figure 6–7 Ports on an 8-port Network Hub
...
LEDs
Electrical outlet
Port 2
Port 1
8
Front view Rear view
MR0203-01
1. Connect one end of the BN25G cable (17–03212–05) to the management
channel connector on the terminal server (
in Figure 6–6).
2. Connect the other end of the cable to a port on the network hub. (See
Figure 6–7 for an example of an 8-port hub. Yours may be different.) If you
need to extend the hub by adding another hub, daisy-chain them together as
described in the hub installation documentation.
NEXT: Proceed to Part 2 (Chapter 8)