Installation guide
Installing Hardware Options 3-3
Compaq Confidential – Need to Know Required
Writer: Gilbert Saldivar Project: Compaq ProLiant 6400R Setup and Installation Guide Comments:
Part Number: 388776-002 File Name: d-ch03 Installing Hardware Options Last Saved On: 3/20/00 12:17 PM
Installing a Processor and Processor Power
Module (PPM)
The ProLiant 6400R server ships with at least one processor, one Processor
Power Module (PPM) installed, and up to three processor terminator modules.
The server can support up to four processors and four PPMs.
1 2
Figure 3-1. Processor and Processor Power Module
To install a processor and a PPM , use the following installation
procedure:
1. Back up the server data.
2. Shut down the operating system as directed in the operating system
instructions.
3. If the server is on, set the power switch to standby.
4. Verify that the first system LED on the front panel, located nearest the
Power On/Standby switch, turns off and that all fans stop spinning.
WARNING: Before removing the top access panel, be sure that the power
switch is in the standby position and that the power cord is disconnected from
the electrical outlet.