User guide

Controller Installation and Cabling Information 4-9
Completing the Installation
Replace the access panel and secure it with the thumbscrews, as required.
NOTE: The server will not operate with the access panel removed. This is necessary to
protect thermally sensitive components by providing the proper air flow through the server
and to prevent contact with hazardous energy during servicing.
Figure 4-4. External cabling on ProLiant Tower Storage Systems
NOTE: A Rack-Mountable device configuration will differ in appearance.
Figure 4-5. External cabling on StorageWorks Enclosure 4200 Model 4214R