Operating Instructions and Installation Instructions

ComNav Vector G2 & G2B Installation & Operation Appendices
Document PN 29010078 V2.0 - 73 -
DRAFT #3 – 29 May 2009
The new connection’s communication session will then start – but HyperTerminal is
not fully set up yet for use with the G2, so click on the Disconnect button, to stop the
session:
Figure 24 – Disconnect Button Figure 25 – Call Button
Set up the remaining COM port parameters; select File Properties Settings:
Figure 26 – COM Port Properties Dialog Box, Settings Tab
www.busse-yachtshop.de | info@busse-yachtshop.de