Operating Instructions and Installation Instructions

ComNav Vector G2 & G2B Installation & Operation
Document PN 29010078 V2.0 - 2 -
DRAFT #3 – 29 May 2009
Document History
Revision Date By Description
1R0 -1R2 01 March 2006
through
07 July 2006
DC, et al
first release
1R1 & 1R2: minor edits based on user feedback
1R3 31 May 2007 DTO
added G2B & second-generation information
reformatted to new template
1R4 13 June 2007 DTO
added instructions on Baud rate settings for use with
ComNav autopilots
added some more information on configuration options
moved the DGPS configuration description into the main
body
1R5 14 December 2007 DTO
corrected information in Wiring Diagram and associated
table
1R6 04 December 2008 DTO
updated Wiring Diagram & Table to correct for error in
OEM cable colour documentation, and to use the correct
signal names (`A’ & `B’) from the NMEA 0183 standard
updated the NMEA Output & Configuration tables with the
second-generation Vector commands, & moved them into
the main body of the manual, for easier reference
updated specifications for the second generation
added Warranty Statement
updated QMI logo
1R6
Addendum #1
31 March 2009 DTO
contains information on new “ComNav factory standard”
configuration & related new wiring
new information on commands & parameters & usage
both taken from draft of v2R0 of manual, and valid for
date codes 0902, 0907, up to ~0918
2R0 28 May 2009
DRAFT #3
DTO
valid for date codes 0902 and later (& 08xx, with some
caution)
updated numerous sections in order to comply with
international approval (pending) requirements
added diagrams & configuration details for Pitch & Roll
expanded Alignment instructions
revised Wiring Diagram, added supplementary diagrams
for other wiring & usage alternatives
added PC serial port & HyperTerminal usage information
added examples of command input & typical output data
added descriptions of prior generations & cables
added CE Declaration of Conformity
www.busse-yachtshop.de | info@busse-yachtshop.de