Operating Instructions and Installation Instructions
ComNav Vector G2 & G2B Installation & Operation Installation
Document PN 29010078 V2.0 - 23 -
DRAFT #3 – 29 May 2009
Pole Base
Figure 8 – Mounting using the Pole Base
1) Install a threaded mounting pole at the location you have chosen. The pole must be
supplied by you; it must have an appropriate height for the location, and must have
1-14-UNS threads on one or both ends. If you are mounting the pole on a surface,
drill & de-burr a hole in the surface, centered in the pole, with a diameter at least
slightly larger than the G2’s cable.
2) Fasten the pole securely to the vessel, using appropriate fasteners, clamps, etc. of
your choice; ComNav recommends that all hardware be corrosion-resistant.
3) Thread the supplied 1-14-UNS threaded hex jam nut, and then a suitable flat washer,
onto a 1-14-UNS threaded end of the mounting pole – the end which will be the top
end of the pole.
Figure 9 – Jam Nut and Washer
www.busse-yachtshop.de | info@busse-yachtshop.de