Specifications
Chesapeake College Todd Performing Arts Center Auditorium
Audio System Upgrade
March 20
th
, 2015
Audio Systems 27 41 00-7
8) Provide remote control room management software and full licensing for each
system on the project.
9) Full function control of all source components, processing devices and switching
electronics.
10) In sub-dividable spaces, provide both IR and closed contact partition sensor
control, and automation of control system scenerios.
11) Touch panel page layouts shall be submitted for approval. Prior to designing
touch panel layouts, meet with the Owner and review existing control system
standards on campus and determine a basis of design.
12) Follow-up programming and modifications as requested by the Owner shall be
provided 6 months after system acceptance. Provide and install updated editable
source code to the Owner following these updates.
13) In the event the remote control system programming becomes compromised
during the warranty period, provide the necessary effort to make the system fully
functional once again.
3. The specified Audio System shall be ADA compliant through connection to the existing
Assisted Listening System currently installed in the Auditorium. Provide all required
cabling and connections to maintain the current assisted listing system functionality.
1.8 SUBMITTALS
A. Submittal Data
1. Submittal data is to be submitted in a three ring binder, a continuous spiral binder, or
plastic binding that allows the booklet to lie flat while open. Submission of the below
materials in electronic format is also be acceptable. Each booklet shall contain the below
in the following order:
a. Cover Sheet.
1) Include name of supplying contractor and project name.
b. Detailed Bill of Materials.
1) Include a listing of: component quantities, equipment manufacturers, model
numbers, and description of each component being supplied, and the
specification paragraph or drawing sheet that corresponds to the product. Failure
to provide this information will result in the rejection of submittals.
c. Product Data.
1) Include a catalog sheet per product of equipment listed in the Detailed Bill of
Materials, in the exact order as the Detailed Bill of Materials. Each catalog sheet
shall describe mechanical, electrical and functional equipment specifications. The
catalog sheet must also include an image of the product. Photocopy duplications
of the manufacturer’s original equipment catalog sheets will be allowed as long
as they provide adequate clarity of both the printed word and graphics/pictures.
If more than one product is shown on the catalog sheet the intended product
must be denoted by either an arrow or highlight.
d. Authorized Distributor Certificate.
1) Recently dated (within one year from submittal date) support letter from
manufacturer stating that the supplying contractor is an Authorized Distributor of
the product being supplied.
B. Shop Drawings