User Guide

Table Of Contents
Chapter 3 Configuring the S1000C Router
S1000C User Guide, Release 1.5 3-15
DR
AFT
6 Accept the defaults in other fields on the screen. Click Apply.
When the WAN LED is solid green your Internet connection is available. If
setting up PPPoE takes more than 15 minutes at startup, the WAN LED will turn
solid red. Once the PPPoE connection is set up, the LED turns solid green. If the
LED remains solid red, contact your ISP.