User's Guide

Table Of Contents
Chapter 1 Getting Started
S1000 User Guide, Release 1.0 9
DR
AFT
When is your S1000 ready to use?
After installing and turning on your S1000 for the first time, the S1000 goes through
an automated setup sequence.
The table below shows the S1000 LED states during normal boot-up. Refer to Table 1
for LED color codes.
Table 2. LED states during S1000 boot sequence
WAN NET GPS LTE WiFi S1000 State
Performing initial HW tests (1-2
seconds)
HW tests are complete; software is
loading.
Software is loaded; services are
initializing.
WAN port is connected over the local
network; IPSec tunnel is not
established.
WAN port is connected; IPSec tunnel
is established and UP.
WAN port is connected; IPSec tunnel
is established and UP; GPS Time Fix
is available; LTE service is UP.
WAN port is connected; IPSec tunnel
established and UP; GPS Time Fix is
available; LTE service is UP; WiFi
service is UP.
During boot-up the device’s green LED will be solid for a few seconds during initial
hardware tests. Upon completion of hardware tests, all LEDs, except the WAN LED,
will turn off until the software loads. This takes 1 to 2 seconds.
When the WAN, NET, GPS, LTE, and WiFi LEDs are solid green, your S1000 is
ready for
use.