Specifications
Appendix D Field Replaceable Units
D-66 M0303A2 4.5.01 September 2020
D
R
A
F
T
7 Connect the Ethernet cable to the RP.
8 Verify the RP installation. See The operational state of the RP can be determined
by the LED status on the RP. Additional information can be attained from the
WebGUI status screens.
For verification procedures, see RP post-replacement verification.
Replacing a pole mounted Indoor RP
1 Disconnect the Ethernet cable.