Installation Instructions
Table Of Contents
Chapter 2 Preparing to install the OneCell system
2-2 913035 4.0.04 June 2019
D
R
A
F
T
Overview
This document describes the OneCell installation and includes:
• Chapter 3, Baseband Controller installation
• Chapter 4, RP5100i installation
• Chapter 5, Ruggedized Radio Point Installation
Before installing the OneCell components
Before installing the OneCell components, the system integrator must plan the
network for the topology that will be deployed. See OneCell Network Planning Guide
(913023).
CommScope recommends that cables and switches be in place before installing the
OneCell components. See
Appendix E, Cable installation and power separation
guidelines for more information.