Installation Instructions

About this document
OneCell
®
Installation and Commissioning, RP5000 series, Release 4.0 xv
D
R
A
F
T
Conventions
This guide uses the following text conventions, as applicable.
OneCell
®
Installation and
Commissioning (913025)
Includes detailed installation instructions for
Baseband Controller and Radio Points hardware,
planning the installation, physical install, how to
configure the installation, commissioning the
installation to service; verification tests after the
installation.
OneCell
®
Administration (913026)
Contains enterprise-level monitoring and alarms.
OneCell
®
Troubleshooting
(913022)
Covers common troubleshooting scenarios in
deployed devices and troubleshooting methods.
OneCell
®
Deployment Guide
(913028)
Contains the device network overview, including
CommScope provided components and required
components from other vendors, DMS overview, and
device overview and requirements.
OM and KPI Reference for
OneCell
®
Devices (913159)
Describes the operational measurements and key
performance indicators for OneCell devices.
Table 1. Customer documentation
Title Contents
Table 2. Conventions
Convention Description
Syntax symbols
< > Enclose a required parameter or set of parameters. For
example:
>band-class <class>
<class> is a required parameter.
[ ] Enclose an optional parameter or set of parameters. For
example:
>activate image <version> [reboot]
[reboot] is an optional parameter.