Installation Instructions

Table 6-1. OneCell Baseband Controller operational status
Case Status LED RP ERR LED TIMING LED CORE LED
Powered On Green, solid (3 Sec) Green, solid (3 Sec) Green, solid (3 Sec) Green, solid (3 Sec)
Internet - Yes Green, solid OFF Green, solid Green, solid
IPsec - Yes
Timing - Yes
Config from DMS - Yes
Remotes connected - Yes
Connection to MME - Yes
Sectors UP - Yes
Chapter 6 Verifying the OneCell installation
OneCell
®
Installation and Commissioning, RP5000 series, Release 4.0 6-3
DR
AFT
Verify the Baseband Controller installation
Once the BC reboot is complete, log into the WebGUI to display the Management
Mode Dashboard.
Check the following information on the Dashboard:
Device Information
Timing Source Status
Radio Points Status
Service Status
CA Server Configuration