User's Manual
Table Of Contents
- Contents
- List of figures
- List of tables
- New in this release
- About this document
- Part I: Overview and preparation
- Airvana OneCell overview
- Preparing to install the OneCell system
- Part II: OneCell component installation
- Baseband Controller installation
- Radio Point Installation
- Part III: Appendices
- Safety
- Specifications
- Installation troubleshooting
Chapter 4 Radio Point Installation
4-16 913020 10.05 April 2015
D
R
A
F
T
• Rod, 3/8-inch threaded
•Nut
• Lock nut, nylon
Flown mount installation
1 Attach the threaded, 3/8-inch rod, cut to the required length, to the ceiling.
2 Install the nut on the rod.
3 Slide the bracket on the rod and install the nylon lock nut.
NOTE: Be sure the bracket is tight between the nuts and there is enough clearance
at the end of the rod to attach the bracket to the Radio Point.
4 Attach the Airvana-supplied mounting bracket to the Radio Point.
5 Connect the Ethernet cable to the Radio Point.
Pole mount
The Radio Point can be pole mounted. This configuration is used for building where
there are no drop ceilings.
3/8-inch rod
Nut
Nylon lock nut