User's Manual
Table Of Contents
- Contents
- List of figures
- List of tables
- New in this release
- About this document
- Part I: Overview and preparation
- Airvana OneCell overview
- Preparing to install the OneCell system
- Part II: OneCell component installation
- Baseband Controller installation
- Radio Point Installation
- Part III: Appendices
- Safety
- Specifications
- Installation troubleshooting
Chapter 3 Baseband Controller installation
OneCell Installation and Commissioning, Release 1.0 3-7
D
R
A
F
T
10 Connect the Ethernet or fiber optic cable to the appropriate port.
11 On the back of the Controller (PFU), turn on the power.
The LEDs on the front panel will be solid green, when the power is on. If none are on,
check your power connection. If the LED pattern is other than all green, see Controller
LED patterns on page C-2.