Chapter 3 Baseband Controller installation
3-2 913020 10.05 April 2015
D
R
A
F
T
Preparing for Baseband Controller installation
Open the shipping box. It should have the components for one complete Controller
Unit:
• Chassis – including four mounting screws
• Controller Unit (CU)
• Power Fan Unit (PFU)
The Baseband Controller is 1U high. Be sure there is enough room for the Controller
Unit in the rack.
Installing the Controller Module into a rack
CAUTION
The controller, when mounted, must in the horizontal position. No other
orientations are allowed.
NOTE
The chassis requires four screws to secure it into the rack.
1 Slide the chassis into the rack.
2 Line up the holes in the chassis ears to the holes in the rack.