User's Manual
Table Of Contents
- Contents
- List of figures
- List of tables
- New in this release
- About this document
- Part I: Overview and preparation
- Airvana OneCell overview
- Preparing to install the OneCell system
- Part II: OneCell component installation
- Baseband Controller installation
- Radio Point Installation
- Part III: Appendices
- Safety
- Specifications
- Installation troubleshooting
OneCell Installation and Commissioning, Release 1.0 3-1
D
R
A
F
T
Chapter 3
Baseband Controller installation
This chapter contains the Baseband Controller installation procedures, including
chassis installation into a rack, Controller Unit and Power Fan Unit installation into
the chassis and the cables required for a basic installation.
Preparing for Baseband Controller installation 3-2
Installing the Controller Module into a rack 3-2