User Manual
Table Of Contents
- Contents
- List of figures
- List of tables
- About this document
- ipBTS system overview
- Planning
- ipBTS C30 installation
- RN commissioning
- Requirements
- CLI connection
- Establishing a console connection
- Connecting the laptop to the ipBTS C30
- Downloading and activating new software
- Verifying SNTP time
- Commissioning the ipBTS C30
- Performing Loopback tests
- The loopback test process
- Backhaul loopback testing
- Ethernet loopbacks
- Looping back Ethernet backhaul links
- Looping back at the Ethernet port
- Entering diagnostic mode and configuring test parameters
- Performing external loopback tests on backhaul links
- Troubleshooting failed backhaul links
- Removing physical loopbacks
- Configuring IP on the Ethernet port and laptop
- Establishing the CLI/SSH/Ethernet connection
- Updating node software
- RN hardware components
- RN Specifications
- Hot-swapping ipBTS hardware
- Index
Chapter 3 l ipBTS C30 installation
Installing the chassis
3-4 910136 Rev01.00 Standard July 2007
Installing the chassis
Position the chassis in the main rack, or cabinet and use the supplied 1/4 in. screws to securely
attach the chassis to the rack.
Unpacking and installing modules
All modules are tested and calibrated at the factory before being packed and shipped. Follow
the steps in this section to unpack, inspect, and install each component of the ipBTS.
WRIST STRAP
Use a wrist strap while performing the procedures documented in this section to safely
discharge static electricity and prevent damage to the equipment.
Figure 3-2. Wrist strap connection point
NOTE
All shelf interconnect cables are included with the shipment. Make the external cables like
power, ground, backhaul, GPS, and RF connections at the site.
Connecting the ground
Ground the chassis by attaching the earth ground wire to the return bus as shown in Figure 3-3.
Attach wrist strap here
Chassis front