Installation Guide
Remove the xture from the packaging.
2
Link multiple xtures by inserting the plug of Fixture A into the
socket of Fixture B. Repeat to add more xtures. The xtures are
now linked together.
Power on Status
1) Pull chain one time, the shop light lights on
2) Pull chain second time, the shop light lights off
3) Repeat above steps, the ON/OFF is cycle
A
B
8
NOTE: Linkable maximum up to 4 xtures. Only the rst shop light needs to be plugged into the electrical outlet.
NOTE: If you want to add shoplights to achieve smart function, please pull chain ten times(5cycles of ON/OFF) when power on initially.
Once the shoplights light on, please try again that pull chain ten times(5cycles of ON/FF) after ten minutes.
Linking multiple xtures
Pull Chain Operation
A
B










