User manual
12 of 17
The housing cover of the control box can then be closed and fastened using the crosshead screws.
3.8.3 Test run
The test run will be initiated by briefly pressing the button located on the control box.
The flashing frequency of the LED (orange) will increase considerably – this indicates the initiation of
the test run. The ProFLECT II i must first be moved to the open position – for that press “DOWN”
button (if the ProFLECT II i is not already at open position). When the open position has been
reached, press the “UP” button and wait until the close position has been reached. After that the
ProFLECT II i will again move to the open position – with this, the test run will be completed and the
LED lights up permanently. The final positions of “open” or “close” are not relevant for the test run.
The test run can be repeated as often as necessary, e.g. when cover parts need to be replaced.
push button