Product Brochure

Installation Instructions
1. Check for nails.
2. Sweep or damp mop.
3. Roll out one width of membrane.
4. Flip over so foil faces up.
5. Cut roll at the wall.
6. Install flooring planks.
7. Roll out next width.
8. Seal seams with tape.
(Basement application or over
concrete a vapour barrier tape
is required.)
Repeat steps 3 to 7 until floor is completed.
NOTE: When installing ComfortBoost™ in basement or
where a moisture barrier is required, extend the
underlayment 1” - 2” up the sides of all walls. New
concrete should cure for 60-90 days minimum, before
installing flooring products. Check for excessive
moisture in various areas before installation referring to
flooring manufacturer’s recommendations. Consult with
your flooring specialist for additional instructions.
TM