Specifications
9. MDF stands for
.
10. Give three reasons for putting your equipment on an MDF?
11. The cabinet should be located to the right of the AC power
source to minimize the cabling distances; true or false?
12. Before you connect the power for testing, you should always
perform a
?
13. What should you do if you have a board malfunction during
your testing?
14. What are the first two boards that you should install when
testing your system?
15. You should use a
to check your digital stations.
16. In the second video of the DXP training series, the narrator and
installer are putting a DXP in what type of business? What is
the business’s name?
17. Video Two introduces an installer and programmer; what is his
name?
2
-
10 Planning An Installation