Specifications

DXP Correspondence Manual
Planning An installation
Chapter Two
1.
Review
In evaluating the DXP installation site, what are three things
that you should always consider before you begin a new
installation?
.
Questions
2.
In planning for an installation, you must also consider
peripherals such as (name four).
3.
In considering what components you need to order for the
system:
The number of telephones will determine how many
.
The type of telephones will determine whether you use
,
,
or
boards.
The number of lines will determine how many
The total number and type of boards will determine whether
you will need
.
4.
When you are installing the boards, always place the first two
station boards in the auxiliary/universal slots to allow for
future expansion, true or false?
5.
What is the required temperature range of a dedicated
equipment room?
6.
The DXP requires a
circuit for installation.
7.
You need to make sure that the DXP is within 25 feet of the
outlet; true or false?
8.
Name five tools that Comdial recommends you to have for an
installation.
I
Planning An Ins talla tion 2
-
9