Specifications

Planning An Ins talla tion
DXP Correspondence Manual
2.8
Testing The
Stations
2.9
Concluding
Chapter Two
With your station boards installed, do a quick check on the digital
stations themselves. Plug each station into a station port and then use a
digital armiger (you can purchase these from any supply house). Plug
the
armiger
into the board and test each port on the board
with-a
telephone that you know is operable. Then unpack each of the
telephones and test them on one of the station ports. Testing the
boards one-by-one this way not only guarantees that all of our
equipment works as it should, but it also makes it immediately
obvious which board is the problem should a malfunction arise.
Plus, you’ll know all of this information well in advance of your
installation date.
This section of the training series has given you a foundation for
planning and evaluating your installation site. If you are unsure about
any of this information, rewind tape two, Planning an Installation, and
reread this section of the manual.
2
-
8 Planning An Installation