Instruction Manual

Table Of Contents
( HORIZONTAL OUTLET DRAINAGE CHANNEL INSTALLATION MODEL: 7075.0125 P: 5/5 )
*
THE WHOLE GAP AROUND AND UNDER THE DRAINAGE CHANNEL SHOULD BE FILLED WITH
CONCRETE GRADUALLY AND HAVE A SMOOTH TOP SURFACE.
*
AS THE LAST STEP, TILING IS APPLIED
*
THE WHOLE SURFACE OF THE DRAINAGE CHANNEL MUST BE CLEAN ED PROPERLY
BEFORE PLACING THE FILTER ELEMENT AND THE GRATE.
*
PLEASE MAKE SURE THAT THE RUBBER PLUG IS ALWAYS ON. THE RUBBER PLUG
MAY BE TAKEN OFF FOR MAINTENANCE ONLY.