User's Manual

Page 24 of 25
5.4.2 Grounding Kit Installation Procedure
a) Prepare ground kit, as shown in Figure 17 1a.
b) Clean the plastic sheath of the control cables, cutting plastic sheath with a suitable
stripper tool, expose metal braid sheath of control cable, with length about 22mm, as
shown in the Figure 17 1b.
c) Remove the protection sheet on the ground kit, clamping the grounding kit around the
control cable, and align with striped line as shown in Figure 18.
d) Tighten the screws of the grounding kit, as show in Figure 19.
e) Connect and tighten grounding cable on the grounding bar which locate at bottom of the
tower.
**Note: The control cables should be in upright position while clamping with grounding kit.
6 Transportation and Storage
6.1 Transportation
Equipment can be carriage by car, train, ship, airplane or other transportation vehicles. Do
prevent rain, avoid excessive vibration and impact during the transportation. Handle with care
while loading and unloading, strictly prohibit drop from height and other rough handling.
6.2 Storage
Packaged equipment should be placed in dry and ventilated area, ambient air without acidic,
alkaline and other corrosive gas. Box stacking shall comply with specification on the box. Storage
period should not exceeded two years, good stored for more than two years will need to pass re-
inspection test before use
Figure 17
Figure 18
Figure 19