User Manual
USER MANUAL FOR COMFLEX 6100
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 60
Figure 80: RU Frequency Band Table
Two parameters need to be set in this step.
RF Switch: Set the RF switch status of Remote Unit.
Target DL Output Power: Expected DL output power setting. Note: Rated output power of LRU is
30dBm and MRU is 37dBm, when Target DL Output Power is set less than rated output power,
software will auto adjust RU gain to make the RU output power reach the expected Power.
Step 8: Click to enter to [Finish] page after finishing RU setup. Click to calibrate other
bands. Click if all bands’ clibration is done.
Figure 81: Commissioning Procedure – Finish
Note:
As the system calibration process is calibrated for single channel, so if there is more than one same band
input, because of the power superposition, the band total output power will higer than target DL output
power after the calibration is complete.
The calibration work is mainly to set device to reach it’s theoretical gain, so when there are two or more
same bands access into and they have the same input power level, each channel will reach it’s rated