3.3 INSTALLATION PROCEDURES
3.3.1 GOODS INWARDS INSPECTION
⚫ Verify the number of packages received against the packing list.
⚫ Check all packages for external damage; report any external damage to the shipping courier. If there is damage, a
shipping agent should be present before unpacking and inspecting the contents because damage during transit is
the responsibility of the agent.
⚫ Open and check each package against the packing list. If any items are missing, contact Comba.
⚫ Do not remove items from anti-static packing until ready for installation. If damage is discovered at the time of
installation, contact the shipping agent.
3.3.2 TOOLS
See Appendix A for a full list of the recommended tools required for installation and routine maintenance.
3.3.3 PREPARATION
⚫ Wall mounting with the masonry bolts supplied, which make use of the outer holes.
8
14
Figure 11: Mounting Rack Overview
3.3.4 WALL MOUNTING FOR MU AND RU
⚫ Drill four holes on the wall using the position of four holes on the mounting rack as a guide. Fix the mounting rack
to the wall using four masonry bolts (M10x110mm).