User Manual
Table Of Contents
- RF500 LITE System Components
- Safety Information
- RF500 LITE Wireless Monitoring System Overview
- Equipment Installation
- Powering On and Off
- Gateway Commissioning
- Gateway Programming and Use
- Gateway Specification – RF500 LITE
- Transmitters Specification – RF512, RF513 and RF516
- Changing Lithium Battery on RF512 Series Transmitters
- Pinout and Wiring
- FCC Approvals
- Equipment Ratings
- Maintenance and Cleaning
- Declaration of Conformity
- Transmitter Error Codes
- Gateway Fault Conditions
- Definitions of Gateway Terminology
- Glossary
- Document Revision History
Gateway Commissioning
This section covers network connection, network configuration, setting date and time, adding
users and adding transmitters.
The Gateway is commissioned using a Web Browser via a Network connection. This
connection can be via cross-over RJ45 cable.
Requirements for Commissioning
• PC with RJ45 Ethernet jack
• Ethernet cross-over cable
• Static IP address and subnet mask (Usually allocated by IT Department)
• Default Gateway IP address (To enable access from different subnets)
• Email server IP address










