Technical data
6
PREPARATION OF THE MACHINE
1. UNPACKING THE MACHINE
The machine is delivered packed on a pallet. To move it use a fork truck or
a pulley block with sling.
2. REMOVING THE PACKAGE
To remove the package proceed as follows:
1. Remove the fixing tapes.
2. Remove the metal staples at package base.
3. Take off the carton.
Package size in cm: 135x93x130.
Weight of packed machine without batteries: 170 kg
3. SLIDING THE MACHINE DOWN OFF THE PALLET
Use a hammer to remove the front crosspiece of the pallet to create a
ramp.
Close the bonnet and pull the machine forward such that it slides to the
ground along the board.