Operating instructions
4.7. Starting continuous operation
When you have carried through all basic settings, you can start with continuous
operation.
&
For initial operation: set back the control data (Re-Setting
and unblock the control system.
Make sure that hoppers which are not in use are separated
from the dehumidified air supply.
Make sure that the set drying temperatures are suited for the
materials in the hoppers.
After first filling, do not process the material until after the
dwelling time.
If a return air cooler is installed, switch on the coolant circuit
of the return air cooler.
Make sure that the cooling appliance is connected to the
mains socket (if present, optional).
Check setting of the timer.
Select ”Main menu”.
Acknowledge with the ENTER-key.
or
Press the ”F2” -key.
Select ” Dryer on ”.
Acknowledge with the ENTER-key.
Dehumidified air dryer
Start-up 4-27










