Instructions / Assembly

Handlebar Assembly
STEP 1
STEP 6
Shift Lever Installation
NOTICE: THESE ARE ASSEMBLY INSTRUCTIONS ONLY. BEFORE STARTING THE DIRT
BIKE FOR THE FIRST TIME , REFER TO THE OWNERS MANUAL FOR PRE-RIDE INSPECTION
PROCEDURES. INCLUDING, OIL TYPE AND QUANTITY, TIRE PRESSURES, FUEL TYPE, ETC.
BEFORE STARTING THE DIRT BIKE FOR THE FIRST TIME READ OWNER’S MANUAL
THOROUGHLY. THE OWNER’S MANUAL HAS IMPORTANT INFORMATION REGARDING
SAFETY, MAINTENANCE AND PROPER PRE-RIDE INSPECTION PROCEDURES.
Torque M8 x 20bolts - 20ft.lbs
NO. NAME QTY SPEC.
1 HEX HEAD BOLT 4 M6X35
2 TOP CLAMPS 2
3 HANDLE BAR 1
4 BOTTOM CLAMPS 2
5 UPPER TRIPLE BRACKET 1
NO. NAME QTY SPEC.
1 NUT 1 M6X20
2 GEAR LEVER 1