Specifications

32
1 Make sure the Power Switch and bleed valve are in the OFF (O)
position.
2 Attach the blast hose and the control cable to the machine.
3 Securely attach the applicator to the blast hose and control cable.
Make sure the Rotation Stop is facing UP.
Verify that a nozzle is locked into the Blast Applicator.
4 Attach the whip-check to the air supply hose and extend it as far as
possible on the air hose.
Attach the Air Supply Hose to the inlet air pipe on the back of the
machine. (Check the data plate for the operating pressure range).
Starting Up
Operation