Specifications

11
IMPO RTANT
ALWAYS MAKE SURE THE HOPPER IS
EMPTY AND BLAST WITH AIR ONLY,
FOR 1 MIN. WHEN SHUTTING DOWN
LONGER THAN 15 MIN.
FAILURE TO DO SO MAY RESULT IN
FEEDER AND/OR NOZZLE FREEZE-UP.
For optimal performance it is recommended that the air supply dew
point be -40
o
F (-40
o
C) or lower.
For optimal performance make sure the air is clean and free from oil
and grit.
If needed, use an after-cooler and an air dryer with air filtration,
to obtain desired air quality and dew point (air drying and filtration
equipment may be purchased from Cold Jet).
If you intend to provide your own air drying and filtration equipment,
consult Cold Jet Customer Support for assistance in selecting the
correct models.
The length of blast time at higher dew points depends on relative
humidity, temperature and excessive condensation in the hopper and
on the pellets.
At EVERY blasting start-up ALWAYS purge the Cold Jet AeRO 75 &
75-DX with compressed air before adding pellets to the hopper.
ALWAYS shut the fill lid to avoid foreign objects falling in.
ALWAYS avoid bad ice.
Before You Begin
Safety