Specifications

11
IMPO RTANT
ALWAYS MAKE SURE THE HOPPER IS
EMPTY AND BLAST WITH AIR ONLY,
FOR 1 MIN. WHEN SHUTTING DOWN
LONGER THAN 15 MIN.
FAILURE TO DO SO MAY RESULT IN
FEEDER AND/OR NOZZLE FREEZE-UP.
• For optimal performance it is recommended that the air supply dew
point be -40
o
F (-40
o
C) or lower.
• For optimal performance make sure the air is clean and free from oil
and grit.
• If needed, use an after-cooler and an air dryer with air filtration,
to obtain desired air quality and dew point (air drying and filtration
equipment may be purchased from Cold Jet).
• If you intend to provide your own air drying and filtration equipment,
consult Cold Jet Customer Support for assistance in selecting the
correct models.
• The length of blast time at higher dew points depends on relative
humidity, temperature and excessive condensation in the hopper and
on the pellets.
• At EVERY blasting start-up ALWAYS purge the Cold Jet AeRO 75 &
75-DX with compressed air before adding pellets to the hopper.
• ALWAYS shut the fill lid to avoid foreign objects falling in.
• ALWAYS avoid bad ice.
Before You Begin
Safety










