Technical data
Part
X
-
Maintenance
Your Coldelite freezer has been designed,
engineered, and manufactured to achieve high per-
formance and long durability The life expectancy of
any machine depends not only on the quality of
engineering, and components used, but also on the
basic maintenance procedures
It is important for you to become familiar with a few
of the basic operating procedures
Only remove or ings with the oring extractor
provided in the machine spare parts kit.
Clean and sanitize the freezer in accordance with
the instructions in this operation manual
Lubricate all orings and seals as instructed.
The wearing or the improper cleaning of the
beater shaft seals will result in product leakage
into the rear of the machine Check the side drip
chutes frequently and replace seals when
necessary
Replace any oring that is leaking or damaged
When all of the spare parts supplied in the spare
parts kit are used, re-order immediately. Do not
wait until the part is urgently needed or causes the
machine to be inoperative without it
NEVER
use the Automatic or Stand-By mode in
the cleaning, sanitizing or initial filling of the
freezer. This can damage the freezer and its
components
During the washing, cleaning and sanitizing
procedures, operate the machine in the BEATER
mode as little as possible This will minimize
component wear on the freezer
When removing and installing the freezer parts,
handle these with care
DO NOT
drop or bang
together as this will damage the parts and affect
the freezers per formance
NEVER
use
HOT WATER
when washing,
cleaning, or sanitizing your freezer or its parts
ALWAYS
use luke warm water
(80-90F)
!!
IMPORTANT
!!
If your machine is Water Cooled, it is important that it is
not stored at a temperature below 32 degrees
F
Before
storing at a temperature below 32 degrees you must re-
move all liquids from the freezer and winterize the water
condenser coil This should be performed by an autho-
rized service technician to avoid damage to the freezer
The following is a recommended wearable parts replace-
ment schedule This is for normal operation
ofthe freezer
and will vary based on the volume and type of product
served as well as operational and cleaning procedures.
Redacement Schedule
Orings and Seals -Every
6
months or as needed
Beater Scraper Blades
-
Every
6
months or as needed
Beater End Pusher -Every year or as needed
(Maximum
of
3
Seasons of Operation)
Drive Belts
-
Every
2
years or as needed
Pump Gears
-
Every 3 years or as needed
Pump Drive Bearings -As needed
Plastic Parts -As need when leaking, scratched, or bro-
ken
Rebuild Mix Pumps
-
Every
5
years or as needed
Check Gearbox Grease Levels -Annually
Electrical Components
-
When malfunctioning
!!
IMPORTANT
!!
Prior to opening any of the machines outerpanels,
place both sides in the STOP/ OFF mode and discon-
nect the machines power supply. Failure to do so can
result in serious injury and or death.
If'
your machine is Air Cooled, its efficiency depends
on a clean air cooled condenser. The fins of the con-
denser must be straight and cleaned a minimum of
every two or three months Prior to cleaning the air
condenser, place the machine in the STOP or
OFF
mode and disconnect power to the fieeze r..










