Technical data
You are now ready to install the dispensing head
assembly onto the front of'the fieezer.
Finger tighten the two metal dispensing head-retaining
knobs
Hand tighten the knobs in a criss-cross pattern as
shown below.
C)
Assembling
the
Gravity Feed
Tube
Locate the parts needed to assemble the gravity feed
tubes This should include: A) Splash guard,
B)
Orings (2per), C) Outer regulating sleeve,
D)
Center gravity feed tube
Next, slide the two orings onto the center gravity feed
tube or ing grooves
Slide the outer regulating sleeve onto the center feed
tube Make sure that the two finger hooks are at the
top of the feed tube (farthest away from the orings at
the bottom)










