Technical data

What to do in case of alarm
CODE REMEDY
01 Take off the tension to the system and take on again the tension. If the
problem remains, take off the tension to the system again, take on the
tension and wait 12 minutes (12 minutes waiting time is a compulsory
condition and needs to be checked with a watch), take off the tension
to the system again, take on again the tension.
If the problem remains, you must immediately go to a FASSI
authorised Center.
02 Check the connector of the pressure transducer.
If the problem remains, you must immediately go to a FASSI
authorised Center.
04 See code 02.
06 See code 02.
08 Check if the red light on the proximity sensor is off and verify if
the metallic band is rightly positioned.
09 See code 08.
10 Check that the connector of the mercury sensor level is not damage.
If the problem remains, you must immediately go to a FASSI
authorised Center.
11 You must immediately go to a FASSI authorised Center.
12 See code 11.
14 See code 11.
15 See code 11.
16 See code 11.
17 See code 11.
18 See code 11.
19 See code 11.
20 See code 11.
21 Replace the 10A fuse at the nearest workshop after removing
the carter and the cover of the main panel FX000. (See electric
schematic Par. 5)
22 See code 11.
Only for crane with slew ring:
30 See code 11.
31 See code 11.
32 See code 11.
33 See code 11.
34 See code 11.
35 See code 11.
36 See code 11.
40 See code 11.
41 See code 11.
42 See code 11.
MESSAGES REMEDY
"WINCH OFF"
Place the distributor bank lever controlling the winch in
neutral position.
"WINCH CAL.ERROR"
See code 11.
"STOP BOOM OUT"
Place the distributor bank lever controlling the extension
booms in neutral position. If the warning appears when
the winch cable lifting stroke end is not reached, place in
any case the lever in neutral position and then restart to
operate.
"STOP BOOM UP"
Lifting functions not available; are authorized only descent
functions.
To verify the right working of the differents input it is possible to use the display
in the "INPUT" menu.
16.7.1
CONTROLS TO
OPERATE THE CRANE
GRU FASSI