Technical data
14.5
Manoeuvres to fold the crane "C" into the rest condition
(
only for the crane version āCā
)
(!) IT IS FORBIDDEN TO OPERATE FROM (!)
THE DOUBLE CONTROL SIDE
(!) Operate from ground control distributor side (!)
By operating the corresponding levers:
- completely reenter the extension boom sections;
- lift the inner boom close to its stroke end;
- fold the outer boom to its stroke end;
- lower the inner boom until the hook of the safety device rests on the extension
boom sections;
- extend the extension boom sections until the hook is correctly positioned to be attached;
- do not insist on the control!
- rotate the crane until the reference arrows coincide (on the column and on the base);
- fold the inner boom to its stroke end; the rest locating pin locates into its seat;
- re-position the outriggers to within the overall vehicle width as described on
Paragraph 13.
14.5
CONTROLS TO
OPERATE THE CRANE
GR2_3_4