CENTER FOR ALLIED HEALTH AND ATHLETICS FF&E April 24, 2014
SECTION 27 41 00 AUDIOVISUAL SYSTEMS
Marshall Craft Associates, Inc. 27 41 00-11
Project 12032
1. Within four weeks after award of Contract, submit statement confirming that Contractor
has reviewed the conduit system as designed in building construction documents and,
where applicable, as built.
2. Notify Consultant, General Contractor, Architect or Electrical Contractor of deficiencies
or inadequacies, if any, in conduit system design or installation. If none, so indicate.
3. Absent conduit verification by Contractor and after installation of conduit as designed,
Contractor shall assume costs of equipment, materials, labor and engineering,
including services of owner’s representative(s) in designing and/or verifying revised
wiring approach(es) as relate to providing a fully functional system using conduit as
designed or as revised at the discretion of the owner.
I. Rigging and Mounting Drawings
1. Submit full size drawings outlining mounting and installation details of all AV equipment
requiring integration with cabinetry or architectural elements.
2. Details, stamped and signed by an appropriately licensed engineer, of all equipment
mounting methods and materials provided by the Scope of Work, wherein failure of
method or materials used for mounting or hanging permanently installed equipment
could result in serious personal injury.
a. Details provided by or requiring approval by licensed engineer may include:
method of attachment to building structure or attachment and/or suspension
points; method of attachment to supported equipment; all suspension materials;
a materials list including specifications of all suspension materials; calculations
used to determine loads and strengths of suspension materials, other as deemed
necessary by the engineer.
3. In the absence of submitted approved, stamped and signed mounting and hanging
details, the Owner reserves the right to acquire such engineering approval at the
expense of the Contractor. Owner will notify Contractor of such intent. Contractor shall
remedy within two weeks or Owner may proceed without Contractor approval and
without relieving Contractor from any other obligations set forth by Contract.
J. Color Selection
1. Color options for all items as applicable.
2. Wallplate finishes should be coordinated with the Architect.
K. Samples
1. Color and finish samples of any furniture or lecterns.
1.09 CLOSEOUT SUBMITTALS
A. At the completion of the installation, but before Final Acceptance, provide for review and
approval the following, in compliance with Division 1 SectionCloseout Procedures.
1. Operation and Maintenance Manuals:
a. Equipment manufacturer’s operation and service manuals for each make and
model of equipment.
b. System Operation Manual. Produce a manual specifically for the subsystems
detailed herein. The manual shall describe all procedures necessary to activate
each system to provide for the functional requirements, except as specifically
excluded by the Owner. This section shall provide a simple “How-to” users guide
for the procedures needed to operate the system. This document shall contain a
section on operating the systems equipment in the event of control system