SECTION 27 41 00 AUDIOVISUAL SYSTEMS
Marshall Craft Associates, Inc. 27 41 00-10
Project 12032
1. Commencing with project award, provide weekly status reporting of milestone task
status, anticipated completion date, and related memo notes for the following tasks:
a. Submittals
b. Infrastructure verification
c. Pre-wire status
d. Equipment Procurement
e. Shop fabrication
f. Remote control system design
g. Installation and Terminations
h. Field testing and pre-acceptance testing
i. Final acceptance demonstrations
j. Owner training
k. First owner use
l. Open Coordination Items and Questions
2. See below for a partial example of an acceptable weekly reporting list.
G. Personnel
1. Provide, in writing, within two weeks after award of Contract, the names, mailing
address, phone numbers with extensions, email addresses and paging service
numbers (if available) of the following project personnel:
a. Project Manager
b. Lead Systems Engineer
c. Field Foreman
d. Remote Control System Programmer
H. Conduit Verification
Project:
Project Name
Location:
Project Location
Date:
Project Manager:
Project Manager
Delivered by:
Form Delivered By
Infrastructure Verification:
Submittals:
Product Data
Drawings
Personnel (etc.)
RFIs:
12 Implementing
178 Projector Screen Clearances
Installation Status by Space
Name Number Pre-Wire Order Receive Install Test
Example 1 105 100% 100% 100% 60% 0% Re-programming
Example 2 135 100% 100% 100% 90% 0% Other Notes Here
Status:Projected Completion: Notes:
Form Delivery Date
Notes:
6/1/2011 Complete
8/1/2011
8/1/2011
Room Equipment
8/1/2011
Complete
Complete
Complete
8/25/2011
9/6/2011
Received
Pending