User guide

CENTER FOR ALLIED HEALTH AND ATHLETICS FF&E April 24, 2014
SECTION 27 41 00 AUDIOVISUAL SYSTEMS
Marshall Craft Associates, Inc. 27 41 00-4
Project 12032
1. Submit the costs for a one-year service contract, renewable for up to three years,
which shall commence with the completion of the two-year warranty period. These
contracts shall be fixed-cost, and can be accepted at the option of the Owner.
2. The service contract shall include all of the services provided during the warranty
period, including complete replacement or repair of defective equipment.
1.05 QUALITY ASSURANCE
A. Coordination
1. Coordinate this Section with work of other Project Manual sections and associated
trades.
2. Specific references, herein, requiring coordination of certain work shall not obviate
responsibility for other required coordination.
B. Standards and Codes
1. Comply with
a. Local, state and federal codes
b. Applicable National Electrical Code
c. American National Standards Institute
d. Underwriters’ Laboratories, Inc. standards.
2. All equipment, material, accessories, and loose items provided by Contractor shall be
new and shall conform to applicable requirements of the above-mentioned agencies.
3. If required by local authorities, provide certificates and labels indicating compliance
with above-mentioned codes and standards where applicable.
C. Point of Contact
1. Designate to the Owner in writing, the responsible person who shall ensure timely and
consistent communication with the Owner on progress of the contract. The designated
representative shall have full knowledge of all engineering and production procedures
and shall report status of the installation and upcoming work plans to the Owner’s
Project Manager and Consultant on a weekly basis.
2. Project manager shall have successfully managed not less than two (2) projects of
similar size and scope (as defined in previous sections). Bid submission shall detail the
percentage of time that the project manager and other key personnel will be involved
with the project.
1.06 SCOPE OF WORK
A. Provide the following in accordance with Specifications and Drawings:
1. Submittals delivered in a timely manner as described hereinafter.
2. Verification of dimensions and other conditions at project site. Review conduit system
as shown in electrical section of building construction documents and, where
applicable, as built conditions.Notify Consultant, Architect, GC, and EC within four
weeks after award of contract of any deficiencies or inadequacies in conduit system
design.
3. Detailed design of Digital Signal Processor system “maps,” including remote-control
accommodations.
4. Complete programming of audiovisual remote control system inclusive of graphical
layout and source code programming
5. Power distribution within equipment racks including power connection to electrical
outlets as described in electrical section of building construction documents.