Operation Manual

Assembly Instructions (Cont.)
Insert the clip joint of the collection bag into the
ejection pipe at the motor housing. (Fig. 5)
Operation
Before starting the machine, make sure that the debris collection bag (9) is
correctly fitted and the shoulder strap (12) is adjusted to a suitable working
position.
Ensure the blower tubes are properly secured prior to operation.
Turning On and Off:
To Switch On: Push the On/Off Switch (2) to the ‘1’ on position.
To Switch Off: Push the On/Off Switch (2) to the ‘0’ off position.
10
Operation continued