User manual

Using the LCD Console
29
The CacheRaQ will reboot.
Powering Down
!
Caution: To prevent the potential loss of data, it is important to
follow the proper power-down procedure before turning off the
CacheRaQ.
To select the power-down application:
1. From the LCD console, hold down the button for
approximately 2 seconds.
The LCD screen displays:
SELECT:
SETUP NETWORK
2. Press the button twice until POWER DOWN appears
in the LCD display:
SELECT:
POWER DOWN
3. Press the button to choose the power-down
application.
4. Using the control keys, toggle the cursor between
[Y]ES
and [N]O and select [Y]ES to power down
the system.
5. When the CacheRaQ is ready to be turned off, the
LCD displays:
PLEASE SWITCH
POWER OFF NOW
6. Press the On/Off button to turn off the CacheRaQ.
Resetting the Network Configuration
The Reset Network function resets the Hostname, IP
Address, Netmask, Gateway, and DNS information to
that of a new, unconfigured system. This function may be
useful if you’re moving the CacheRaQ to a new network.
S
S
E