User manual
Appendix A: Using the LCD Console
152 Cobalt RaQ 4 User Manual
To configure the RaQ 4 for the UPS, first connect the UPS unit and the RaQ 4,
and then configure the RaQ 4 through the LCD panel. (Refer to the UPS manual
for more information on connecting the devices.)
1. Plug the UPS into the wall socket.
2. Turn on the UPS.
3. Plug the RaQ 4 servers into the UPS power sockets.
4. Connect the UPS serial cable to the UPS unit and the serial port on the
RaQ 4 that will serve as the master. See Figure 58.
5. On the LCD console, hold down the button for approximately
2 seconds.
The LCD screen displays:
SELECT:
SETUP NETWORK
6. Press the button until
Configure UPS
appears in the LCD screen:
SELECT:
CONFIGURE UPS
7. Press the button.
8. Use the arrow buttons to toggle the cursor between [ ] On and [ ] Off.
Select [ ] On.
9. Press the button.
10. Use the arrow buttons to toggle the cursor between [M]aster and [S]lave.
11. Press the button. If you choose [M]aster, the RaQ 4 configures itself
automatically for the UPS.
☞
Important:
You must use the serial cable shipped with the UPS
unit.
S
S
E
E
E