Specifications
Project #2008377 VIDEO PRODUCTION SYSTEM
Section 11130 (or 27 41 30)
Page 4
Video Production Redesign FBC Highland Park
Landover, Indiana
10/07/2013
1. Submitted as a multi-sheet PDF document with:
a. 42" X 30" sheets
b. Table of Contents.
c. Bookmarks for every sheet with Sheet Name and Number
LCD Flat Panel locations, orientation, and mounting methods.
Custom Console Diagrams with overall dimensions including production switcher control panel and
CCU control panel integration.
Rack/Furniture Layout and Location Diagrams with overall dimensions.
Location of all equipment in racks, consoles, millwork, enclosures or on counter top / tables with
dimensions; wire routing and cabling within housings; AC power outlets, terminal strip and UPS
locations.
Drawing of cable routing to racks and stations detailing plans for critical signal separation.
Antenna orientation, mounting elevation, and attachment hardware schedule.
Schematic diagrams for all Systems, including all wiring labels.
IP address schematic diagram showing network topology and each networked device with IP address.
Patch Bay details, including all patch point labeling.
Schedule of terminations for all systems.
AC power schedule.
Schematic drawings of any custom circuitry or equipment modifications, including connector pinouts
and component lists.
Asbestos and PCB Certification: After completion of installation, but prior to Substantial Completion, the
Contractor shall certify in writing that products and materials installed, and processes used, do not contain
asbestos or polychlorinated biphenyls (PCB).
Hazardous Materials Notification: In the event no product or material is available that does not contain
asbestos, PCB or other hazardous materials as determined by the Owner, a “Material Safety Data Sheet”
(MSDS) equivalent to OSHA Form 20 shall be submitted for that proposed product or material prior to
installation.
Bid Submittals:
Contractor's Qualifications: Have previously installed at least 4 jobs of similar magnitude,
completed within the last five years. Provide name and phone number of reference for each
representative project. Identify at least one such completed job available for inspection by
Consultant or Owner’s Representative.
Bidder will confirm in writing that the firm has five years of experience with equipment and
systems of the types specified, that the firm maintains a fully staffed and equipped service facility,
and that the firm is a franchised dealer and authorized service facility for the major brands
specified, and that the firm is properly licensed to work in Landover, Indiana.
Bidder will confirm in writing that and Sub-contractor firm has five years of experience with
equipment and systems of the types specified, that the Sub-contracting firm maintains a fully
staffed and equipped service facility, and that the firm is a franchised dealer and authorized
service facility for the major brands specified, and that the firm is properly licensed to work in
Landover, Indiana. Bidding contractor will identify all Sub-contractors on the Bid Response team
and a detailed scope of work for each Sub-contractor.
Provide resumes of project manager, lead engineer and lead installers working on this project.
This will include key team members of any Sub Contractor. Resumes must be submitted with
this bid response