Specifications

Project #2008377 VIDEO PRODUCTION SYSTEM
Section 11130 (or 27 41 30)
Page 2
Video Production Redesign FBC Highland Park
Landover, Indiana
10/07/2013
System features or devices which are mentioned in one part of the Contract Documents may not be shown
in the other. In case of conflict between the written specifications and the drawings, Contractor must seek
clarification from the Consultant. In the event that the Contractor fails to obtain such clarification, the
interpretation of the Consultant will prevail.
The Contractor will provide minor accessories, such as power supplies, connectors, adapters, matching
devices and equipment items needed for a complete system, even if not specifically mentioned herein or
on the drawings, without claim for additional payment.
Contractor shall obtain all licenses and permits necessary for the execution of any work pertaining to the
installation within this scope of work.
Contractor will comply with all union jurisdiction and prevailing wage requirements for the completion of the
project. Questions regarding jurisdiction and wage should be directed to the Owner.
If a conflict is identified between the specification and the appropriate codes and is reported to the General
Contractor and confirmed prior to project award, the Architect will prepare the necessary clarification or
revision. When a conflict is reported after project award, the Contractor will propose a resolution of the
conflict and, upon approval, perform related work.
Coordinate with other contractors as required and in a timely fashion to convey all information (scheduling,
structural, electrical, technical or otherwise) necessary to complete the project.
Coordinate any installation of rack mounted devices into facility equipment racks with others.
Provide and install equipment racks in a manner in keeping with local seismic codes. Racks are to be
electrically decoupled from flooring to prevent coming into contact with any safety grounded items during
operation. Raised floor stringer grids must not make contact with the racks, but may be secured to rack
risers. Racks should be mounted on rack risers that are bolted to the slab independently of the raised
flooring systems. Rack risers may be separated from the racks using either rubber matting or masonite
and bolts may be sleeved with nylon bushings for isolation.
The Contractor will be responsible for the supply and installation of AC power connections and circuits
within the equipment racks that are to be provided under this section. The Contractor is to provide a 4”x4”
J-Box at the bottom of each rack with power circuit cabling terminating in 24” pig tails. Label each outlet as
to which AC circuit is feeding it and provide the same information in the circuit breaker panel. The
Contractor will provide all AC power and conduit to the equipment racks and will terminate AC power circuits
within J-Boxes at bottom of racks.
The Contractor will be responsible for connecting ground point to all equipment in accordance with NEC
code and standards specified.
The Contractor will provide a dielectrically insulated ground joint connection that will isolate any conduit
systems from the chassis of the rack where conduits enter any equipment racks provided under this section.
Provide all transportation and hoisting.
Provide protective covering during construction/installation to prevent damaging or entrance of foreign
matter.
Replace at no expense to Owner, product damaged during delivery, storage or handling.
Provide safe and protected storage. The Owner takes no responsibility for damage or theft relating to
negligence in failure to secure equipment by The Contractor. If secure on-site storage cannot be arranged
with the Owner, it will be The Contractors responsibility to procure portable on-site storage.