Specifications
Project #2008377 VIDEO PRODUCTION SYSTEM
Section 11130 (or 27 41 30)
Page 31
Video Production Redesign FBC Highland Park
Landover, Indiana
10/07/2013
Training will be provided in a series of classes to operations personnel to review all aspects of operation
and maintenance of the system. Follow-up sessions to better enhance the operator's ability to expand or
maximize the system will be made available.
The system training will include 2 day(s) of technical training covering the explanation of the system,
including documentation, configuration, interfacing and diagnostics. Provide training of the video system
operators and maintenance personnel as follows:
System Overview: Explanation of system includes documentation, configuration, interfacing and basic
diagnosis.
Operator Training General: Basic training in the use of system devices including powering, timing and
general operation of overall system.
Operator Training Specific: Advanced training in use of system devices including terminal equipment,
signal routing, switching, recording, cameras systems and audio operations. Training also includes
overview of clip server and graphics system operation. Where specified, training will be by
manufacturer representatives.
Manufacturer training and commissioning is specified in this document. The Contractor will cover expenses
such as flight, hotel, rental car, and meals and include them as part of the bid pricing.
END OF SECTION