Specifications

70
Issue 01 XYZ Machine Tools July 08
XYZ 560 Mini Mill and 710 VMC Operation Manual
5.6.4 Installation of Power and Alarm to the Lubrication System
Note - A fuse must be installed between the power supply and the lubricator.
To connect the cable for power and alarm:
1. Remove the screws from the control box casing, refer to Figure 46.
2. Remove the upper cover of the control box.
3. Remove the cable gland that fastens the cable to the left side of the control box, refer to
Figure 47.
4. Push the cable through the opening into the casing, refer to Figure 48.
5. Loosen the earthing point screw at position P1 6, refer to Figure 49.
6. Connect the ground cable and tighten the fixing screw.
7. Connect the positive and negative cables for “POWER” at position P1 4 and P1 5, refer to
Figure 49.
Note - In this configuration, the motor will start when you operate the restart key.
Note - The YET-C1 / YET - C2 lubricators are designed to lubricate by external
control.
8. Connect the external control system or computer to the external ports at position P1 3
and P1 4, refer to
Figure 49.
Note - You can also connect the controller to the alarm adaptors at position P1 1 and
P1 2, refer to
Figure 49. The warning system for YET-C1 is suggested as the oil-level
switch and for the YET-C2 model the pressure switch. The Alarm will activate when
the oil level is low for the YET-C1 model and when the pressure is low for the YET-
C2 model.
9. Connect your alarm system as necessary with the lubricator.
10. Install the cover after having connected all cables.
11. Install the cover screws.
12. Install the cable securing gland to secure the cables.
13. Connect the lubricator to the power supply.
When connected correctly, the lubrication indicating lamp will illuminate and the lubricator will
start to lubricate.